2027 Bentley Torcal Is Sold Out for Its First Year Before Production Even Starts
Bentley's first electric SUV has filled its 2027 production allocation despite falling brand sales. Australian arrivals are expected in late 2027.
The 2027 Bentley Torcal has sold out its first year of production before assembly has begun, Bentley Motors CEO Frank-Steffen Walliser told Automotive News.
Every 2027 production slot for Bentley's first fully electric vehicle has been allocated, with new customers now being given delivery dates in 2028. Bentley has not disclosed how many Torcals it intends to build next year, leaving the scale of that allocation unknown.
Car finance or novated leasing could save you thousands
Get a free, no-obligation quote from our finance partner, Loan Options — for straightforward car finance, or package this car through your salary with a novated lease.
Production of the five-metre electric SUV is scheduled to begin in the first half of 2027 at Bentley's factory in Crewe, England. Australian arrivals are expected in late 2027, with local pricing yet to be announced.
The allocation milestone contrasts with a decline in Bentley's overall business. The brand delivered 5,970 vehicles worldwide between January and September 2026, down about 17 per cent on the same period in 2025, while operating profit more than halved.
Walliser told Automotive News buyers were also spending on options: “We see cars spec'd north of £300,000” (approx. A$590,000).
A Bentley spokesperson told Automotive News the company was “very pleased with the response and position we're in.”
The Torcal was revealed in London on 23 September 2026, with orders opening that day. United States pricing starts at US$222,495 (approx. A$333,800), rising to US$300,995 (approx. A$451,500) for the First Edition.
| Variant | US starting price | Approximate Australian-dollar conversion |
|---|---|---|
| Torcal | US$222,495 | A$333,800 |
| Torcal S | US$262,695 | A$394,100 |
| Torcal First Edition | US$300,995 | A$451,500 |
Up to 653kW and 600km of claimed range
The Torcal uses two permanent-magnet electric motors, producing 604kW and 1194Nm in the standard model. The Torcal S delivers up to 653kW and 1350Nm with launch control.
Bentley quotes a 0-100km/h time of 3.4 seconds for the Torcal and 2.9 seconds for the S, with respective top speeds of 250km/h and 260km/h.
An 800-volt battery with 113kWh of net capacity provides up to 600km of claimed WLTP range. DC charging capability peaks at 400kW, with Bentley quoting a 10-80 per cent charge in just under 20 minutes and around seven minutes to add 161km of range.
Luggage capacity comprises a 460-litre boot and a 90-litre front boot. The turning circle measures 11.1 metres, while standard wheels are 21 inches on the Torcal and 22 inches on the S.
The 2027 Porsche Cayenne Turbo Electric, which shares the Torcal's Volkswagen Group PPE electric platform, costs $259,900 before on-road costs in Australia; the Torcal's local price remains unannounced. The Porsche offers 623km of claimed WLTP range against the Bentley's maximum 600km, and up to 850kW and 1500Nm with launch control compared with the Torcal S's 653kW and 1350Nm.
The Torcal's planned Australian arrival follows a month in which battery-electric vehicles accounted for 23.1 per cent of local new-car sales. Its late-2027 arrival timing puts Australia within the SUV's first production year, although customers placing new orders now face delivery in 2028.
Got a car to sell or trade in?
Get competing offers from dealers with CarSauce Sell. Free, no obligation.
Get my offersFrequently Asked Questions
New customers are being given delivery dates in 2028 because every 2027 production slot has been allocated. Bentley has not disclosed the number of vehicles in that first-year allocation.
Australian arrivals are expected in late 2027. Bentley Australia has not announced local pricing; the US prices and Australian-dollar conversions are not Australian retail prices.
Bentley quotes up to 600km of WLTP range from a 113kWh net-capacity battery. With DC charging capability of up to 400kW, the claimed 10-80 per cent charging time is just under 20 minutes.



